VW Passat repair


+ 1. Ekspluatatsiiya of the car
+ 2. Maintenance
+ 3. Engines
+ 4. Cooling system
+ 5. Power supply system
+ 6. Ignition system
+ 7. Coupling
- 8. Transmission
   - 8.1. Mechanical transmission
      8.1.1. General information
      8.1.2. Transmission removal
      8.1.3. Transmission installation
      8.1.4. Transmission dismantling
      8.1.5. Dismantling, check of a condition and assembly of primary shaft
      8.1.6. Secondary shaft
      8.1.7. Backing shaft
      8.1.8. Differential
      8.1.9. Gear shifting mechanism
      8.1.10. Installation axial люфта primary shaft
      8.1.11. Installation axial люфта secondary shaft
      8.1.12. Transmission assembly
      8.1.13. Mechanism of management of a transmission
      8.1.14. Adjustment of the mechanism of gear shifting
      8.1.15. Check of level of oil in a transmission
   + 8.2. Automatic transmission
   + 8.3. Distinctive features of transmission of cars with a full drive of Passat Syncro
+ 9. Drive of forward wheels
+ 10. Suspension brackets
+ 11. Steering
+ 12. Brake system
+ 13. Wheels and tires
+ 14. Systems of heating, ventilation and conditioning
+ 15. Electric equipment
+ 16. Body
+ 17. Electric circuits


429b39f6





Repair B3-B4/Passat B3-B4 Volkswagen Passat>> Transmission>> Mechanical transmission>> Installation axial люфта secondary shaft
Adjustment axial люфта a secondary shaft carry out in the following order:

Fig. 8.42. An arrangement of a template and a fixing arm for check axial люфта a secondary shaft


use special a template with a range of measurements of 3 mm and arms (see fig. 8.42 );
insert into the case of the bearing of a secondary shaft laying in thickness of 0,65 mm and establish a cup of the conic bearing. Thus the cup should be densely pressed to laying;
having established a secondary shaft, acquire and tighten nuts of a bearing arm of the bearing the moment of 30 N · m;
fix a template (see fig. 8.42 ) and establish micrometer indications on a zero with a preliminary tightness;
moving a secondary shaft, take readings of a micrometer (the template during operation should not move);
combine: а) the measured value,) constant value = 0,20 mm, in) value of thickness of laying = 0,65 mm. Proceeding from requirements pick up laying of necessary thickness;
having dismantled a secondary shaft, establish on it the picked-up laying;
establish an external ring of the bearing;
grease a shaft with transmission oil and, having established it into place, tighten lock nuts the moment of 30 N · m;
check axial люфт.