VW Passat repair+ 1. Ekspluatatsiiya of the car + 2. Maintenance + 3. Engines + 4. Cooling system - 5. Power supply system - 5.1. Power supply systems of petrol engines 5.1.2. General information 5.1.3. PIERBURG 2EZ carburetor 5.1.4. Air filter 5.1.5. Fuel pump 5.1.6. Fuel filter 5.1.7. Fuel accumulator 5.1.8. Fuel tank 5.1.9. Fuel level sensor 5.1.10. Accelerator cable 5.1.11. Systems of injection of fuel 5.1.12. Inlet collector 5.1.13. System of self-diagnostics and codes of malfunctions 5.1.14. Check of a control system by the Digifant engine 5.1.15. Check of a control system by the CIS-E-Motronic engine 5.1.16. System of production of the fulfilled gases + 5.2. Power supply system of the diesel engine + 6. Ignition system + 7. Coupling + 8. Transmission + 9. Drive of forward wheels + 10. Suspension brackets + 11. Steering + 12. Brake system + 13. Wheels and tires + 14. Systems of heating, ventilation and conditioning + 15. Electric equipment + 16. Body + 17. Electric circuits |
Repair B3-B4/Passat B3-B4 Volkswagen Passat>> Power supply system>> Power supply systems of petrol engines>> PIERBURG 2EZ carburetor
The device of the carburetor is shown on
fig. 5.1
.
Check of the electromagnetic valve 5
(fig. 5.1)
carry out in the following order:
– disconnect from the electromagnetic valve the electric tip;
– connect a wire one end to contact to the valve, and other end to a positive conclusion of the storage battery, the crash should be thus audible;
– if the cod is not present — the valve is subject to replacement.
Adjustment of a gap of an air zaslonka carry out in the following order:
– uncover 26 (see
fig. 5.1
);
– open a butterfly valve of the first chamber and turn a cam 1
(fig. 5.2)
of an air zaslonka so that the screw of 2 adjustments of frequency of rotation of start-up rested against the highest ledge of a cam;
– through an opening 1
(fig. 5.3)
a screw-driver move against the stop draft of a pneumodrive of an air zaslonka;
– measure a gap between an air zaslonka and a mouth, it should be 2,0 (0,1 mm. It is possible to measure a gap by a drill in diameter of 2 mm;
– if the gap differs from specified, insert into an opening 1 screw-driver and, turning the adjusting screw, adjust a gap.
Adjustment of the accelerating pump carry out in the following order:
– remove the carburetor;
– uncover the carburetor;
– fill with fuel the poplavkovy chamber and establish a carburetor cover;
– turn a cam 2
(fig. 5.4)
so that it did not concern the screw 1;
– put under the carburetor a measured beaker with a funnel;
– holding a cam 2 in this situation, smoothly turn a butterfly valve of the first chamber from an emphasis against the stop 10 times, spending for each course 1 with and maintaining then a pause 3 with, putting thus the accelerating pump in action;
– measure amount of fuel in a beaker and divide on 10, the received result corresponds to amount of fuel submitted by the accelerating pump for 1 cycle. This value should make 1,0 ± 0,15 cm3;
– if the received size differs from specified, it is necessary to adjust productivity of the accelerating pump:
– weaken a screw 1 inhaling (see
fig. 5.4
) and turn a cam 2. At cam turn aside "And" the proizvodlitelnost of the pump increases, aside "In" – decreases;
– tighten the screw 1 and законтрите paint.
Check of the automatic starting arrangement is carried out in the following order:
– disconnect a device wire from a connecting block;
– connect to a device wire a lamp;
– the second wire of a lamp connect to a positive conclusion of the storage battery — the lamp should burn;
– if the lamp does not burn, the starting arrangement means is faulty and is subject to replacement
Adjustment of a priotkryvaniye of a butterfly valve of the second chamber carry out in the following order:
completely open a butterfly valve of the first chamber and fix it in this situation by a wooden core
(fig. 5.5)
;
– turn the lever 1 so that the butterfly valve of the second chamber was closed;
– block the lever 1 elastic band (see
fig. 5.5
);
– turn out the persistent screw 2 so that it did not concern an emphasis 3;
– wrap the screw 2 to a contact with an emphasis 3 and then tighten it on a turn quarter;
– законтрите screw 2 paint;
– remove an elastic band and take out the wooden core, both zaslonka should be closed;
– measure gaps "And" and "In": the gap "And" should make 0,4±0,1 mm, a gap "In" – 1,0±0,1 mm;
– if gaps differ from specified, adjust them, turning in the ends of a fork of the lever 1.
Check of a pneumodrive of an air zaslonka carry out in the following order:
– remove the air filter;
– start the engine and leave to idle;
– smoothly a hand close air until when will feel appreciable resistance. During this moment the gap between an air zaslonka and a mouth should make about 4 mm;
– if resistance is not present, check vacuum hoses on existence of cracks;
– if hoses whole, connect to a pneumodrive the vacuum gage and the vacuum pump;
– create in a pneumodrive razryazheny 30 kPas;
– if the pneumodrive is serviceable, the razryazheniye should not fall during 2 mines;
– if the razryazheniye falls, means – the pneumodrive is not tight and is subject to replacement.
Check of a pneumodrive of a butterfly valve of the second chamber is carried out in the following order:
– connect to a pneumodrive the vacuum gage and the vacuum pump;
– create in a pneumodrive razryazheny 5 kPas;
– if the razryazheniye does not fall during 2 mines, the pneumodrive is tight;
– otherwise replace a pneumodrive.
Adjustment of frequency of rotation of start-up of the engine carry out in the following order:
– remove the air filter and disconnect a vacuum hose 28 (see
fig. 5.1
);
– connect to the engine a control tachometer;
– start the engine and slightly open a butterfly valve of the first chamber before obtaining frequency of rotation of a cranked shaft about 2500 mines-1;
– turn a cam 1 (see
fig. 5.2
) against the stop;
– turn a butterfly valve so that the adjusting screw 2 rested on the ledge second for height;
– check on a control tachometer frequency of rotation of a cranked shaft, it should make 2000±100 mines-1;
– if frequency of rotation differs from specified, adjust it the screw 2.
Adjustment of frequency of rotation of idling carry out in the following order:
– disconnect everything consumers of energy – headlights, the fan, a radio tape recorder, etc.;
– disconnect from the air filter a hose of ventilation and muffle it;
– connect a control tachometer and a gas analyzer;
– turn a cam 1 (see
fig. 5.2
) so that it did not concern the screw 2;
– the adjusting screw 1 (see
fig. 5.7
) quantities of a mix, adjust frequency of rotation of a cranked shaft in limits 800±50 mines-1;
– adjusting the screw of quality (structure) of a mix establish level of the maintenance of an oxide of carbon (WITH) in the fulfilled gases 3,0±0,5 of %.
Adjustment of a cable of the carburetor carry out in the following order:
– remove fixing bracket;
– press against the stop a pedal of an accelerator and fix it in this situation;
– press the lever 2 (see
fig. 5.1
) a butterfly valve, having established a zaslonka in completely open situation, and establish fixing bracket in a stopper on an emphasis so that the lever of a butterfly valve had люфт no more than 1 mm.
|
|