VW Passat repair+ 1. Ekspluatatsiiya of the car + 2. Maintenance - 3. Engines + 3.1. Petrol engines of configuration of R4 - 3.2. Petrol engine of configuration of VR6 3.2.1. Technical characteristics 3.2.2. General information 3.2.3. Check of a technical condition of the engine 3.2.4. Removal and engine installation 3.2.5. Removal and installation of a head of the block of cylinders 3.2.6. Repair of a head of the block of cylinders 3.2.7. Pistons and rods 3.2.8. Cranked shaft 3.2.9. Replacement of epiploons of a cranked shaft 3.2.10. Flywheel 3.2.11. Drive of the gas-distributing mechanism 3.2.12. Intermediate shaft 3.2.13. Removal and installation of the oil pallet 3.2.14. Oil pump 3.2.15. Water pump + 3.3. Diesel engines + 4. Cooling system + 5. Power supply system + 6. Ignition system + 7. Coupling + 8. Transmission + 9. Drive of forward wheels + 10. Suspension brackets + 11. Steering + 12. Brake system + 13. Wheels and tires + 14. Systems of heating, ventilation and conditioning + 15. Electric equipment + 16. Body + 17. Electric circuits |
Repair B3-B4/Passat B3-B4 Volkswagen Passat>> Engines>> Petrol engine of configuration of VR6>> Cranked shaft
Removal of a cranked shaft is carried out in the following order:
– remove the power unit from the car (see подразд. 3.2.4);
– disconnect a transmission from the engine;
– unscrew bolts 10
(fig. 3.52)
of fastening of a flywheel, having fixed it from a provorachivaniye, and remove a flywheel 9 from a cranked shaft 1;
– unscrew a bolt of fastening of a pulley 1
(fig. 3.53)
of a cranked shaft and remove a pulley;
– unscrew bolts of fastening of a pulley of the water pump and remove a pulley 2;
– remove chains of a drive of GRM;
– remove a head of the block of cylinders (see подразд. 3.2.5);
– remove the oil pallet;
– remove the oil pump;
– remove pistons with rods in collecting (see подразд. 3.2.7);
– measure axial люфт a cranked shaft with the help щупа (see подразд. 3.1.15) or indicator of hour type. Axial люфт a cranked shaft regulate persistent half rings 3 (see
fig. 3.52
) which are established in the case of the radical bearing No. 5;
– unscrew bolts 12
(fig. 3.54)
of fastening of a forward cover of a cranked shaft and uncover 11 together with a forward epiploon 13;
– unscrew bolts of 4 fastenings of a back cover of a cranked shaft and uncover 5 together with a back epiploon 6;
– mark covers of radical bearings for the subsequent their correct installation;
– unscrew bolts of fastening of covers of radical bearings and remove covers, without taking from them loose leaves;
– remove a cranked shaft;
– remove the top loose leaves of radical bearings (loose leaves of beds of a cranked shaft) and mark them for the subsequent correct installation.
The top loose leaves have a flute for supply of greasing to a cranked shaft.
Fault detection of a cranked shaft is carried out in the sequence described in подразд. 3.1.16.
Controllable parameters are specified in подразд. 3.2.1.
Installation of a cranked shaft is carried out in the following order:
– establish the block of cylinders 2 (see
fig. 3.54
) a case up;
– clear working surfaces of the top loose leaves of radical bearings and grease them with fresh engine oil;
– establish the top persistent half rings 3 (see
fig. 3.52
) the radical bearing No. 5;
– grease all necks of a cranked shaft with 1 fresh engine oil;
– establish a cranked shaft in the block of cylinders;
– establish loose leaves 4 in radical bearings;
– establish persistent half rings 3 in a cover of the radical bearing No. 5;
– establish covers of radical bearings and tighten bolts of fastening of covers the moment of 30 N · m, then tighten them on a corner 180 °;
– turn a cranked shaft manually. It should rotate easily, without breakthroughs;
– check axial люфт a cranked shaft (see подразд. 3.1.15);
– establish pistons with rods assembled;
– establish forward and back covers of a cranked shaft with new epiploons;
– establish a flywheel;
– establish the oil pump;
– put hermetic on surfaces of contact of the block 2 (see
fig. 3.54
) cylinders and the oil pallet 8;
– establish laying 7 oil pallets;
– establish the oil pallet 8 and tighten bolts of the 10th fastening of the oil pallet the moment of 20 N · m cross-wise, beginning from an average part of the pallet;
– execute other operations in sequence, return to removal.
|
|