| VW Passat repair+ 1. Ekspluatatsiiya of the car + 2. Maintenance - 3. Engines + 3.1. Petrol engines of configuration of R4 - 3.2. Petrol engine of configuration of VR6 3.2.1. Technical characteristics 3.2.2. General information 3.2.3. Check of a technical condition of the engine 3.2.4. Removal and engine installation 3.2.5. Removal and installation of a head of the block of cylinders 3.2.6. Repair of a head of the block of cylinders 3.2.7. Pistons and rods 3.2.8. Cranked shaft 3.2.9. Replacement of epiploons of a cranked shaft 3.2.10. Flywheel 3.2.11. Drive of the gas-distributing mechanism 3.2.12. Intermediate shaft 3.2.13. Removal and installation of the oil pallet 3.2.14. Oil pump 3.2.15. Water pump + 3.3. Diesel engines + 4. Cooling system + 5. Power supply system + 6. Ignition system + 7. Coupling + 8. Transmission + 9. Drive of forward wheels + 10. Suspension brackets + 11. Steering + 12. Brake system + 13. Wheels and tires + 14. Systems of heating, ventilation and conditioning + 15. Electric equipment + 16. Body + 17. Electric circuits | Repair B3-B4/Passat B3-B4 Volkswagen Passat>> Engines>> Petrol engine of configuration of VR6>> Cranked shaft 
Removal of a cranked shaft is carried out in the following order: – remove the power unit from the car (see подразд. 3.2.4); – disconnect a transmission from the engine; 
 – unscrew bolts 10 
(fig. 3.52) 
of fastening of a flywheel, having fixed it from a provorachivaniye, and remove a flywheel 9 from a cranked shaft 1; 
 – unscrew a bolt of fastening of a pulley 1 
(fig. 3.53) 
of a cranked shaft and remove a pulley; – unscrew bolts of fastening of a pulley of the water pump and remove a pulley 2; – remove chains of a drive of GRM; – remove a head of the block of cylinders (see подразд. 3.2.5); – remove the oil pallet; – remove the oil pump; – remove pistons with rods in collecting (see подразд. 3.2.7); – measure axial люфт a cranked shaft with the help щупа (see подразд. 3.1.15) or indicator of hour type. Axial люфт a cranked shaft regulate persistent half rings 3 (see 
fig. 3.52
) which are established in the case of the radical bearing No. 5; 
 – unscrew bolts 12 
(fig. 3.54) 
of fastening of a forward cover of a cranked shaft and uncover 11 together with a forward epiploon 13; – unscrew bolts of 4 fastenings of a back cover of a cranked shaft and uncover 5 together with a back epiploon 6; – mark covers of radical bearings for the subsequent their correct installation; – unscrew bolts of fastening of covers of radical bearings and remove covers, without taking from them loose leaves; – remove a cranked shaft; – remove the top loose leaves of radical bearings (loose leaves of beds of a cranked shaft) and mark them for the subsequent correct installation. The top loose leaves have a flute for supply of greasing to a cranked shaft. Fault detection of a cranked shaft is carried out in the sequence described in подразд. 3.1.16. Controllable parameters are specified in подразд. 3.2.1. 
Installation of a cranked shaft is carried out in the following order: – establish the block of cylinders 2 (see 
fig. 3.54
) a case up; – clear working surfaces of the top loose leaves of radical bearings and grease them with fresh engine oil; – establish the top persistent half rings 3 (see 
fig. 3.52
) the radical bearing No. 5; – grease all necks of a cranked shaft with 1 fresh engine oil; – establish a cranked shaft in the block of cylinders; – establish loose leaves 4 in radical bearings; – establish persistent half rings 3 in a cover of the radical bearing No. 5; – establish covers of radical bearings and tighten bolts of fastening of covers the moment of 30 N · m, then tighten them on a corner 180 °; – turn a cranked shaft manually. It should rotate easily, without breakthroughs; – check axial люфт a cranked shaft (see подразд. 3.1.15); – establish pistons with rods assembled; – establish forward and back covers of a cranked shaft with new epiploons; – establish a flywheel; – establish the oil pump; – put hermetic on surfaces of contact of the block 2 (see 
fig. 3.54
) cylinders and the oil pallet 8; – establish laying 7 oil pallets; – establish the oil pallet 8 and tighten bolts of the 10th fastening of the oil pallet the moment of 20 N · m cross-wise, beginning from an average part of the pallet; – execute other operations in sequence, return to removal. |  |